logo

  • 0523-243379

  • info@teuman.it

  • Strada Castellana, 1206

  • Lusurasco – 29010 Alseno (PC)

  • 08 - 12 | 13:30 - 17:30

  • Opening hours

  • Compaction shovel overhaul, telescopic cylinder overhaul, hydraulic box overhaul, installation of a new electrical panel and also a new hydraulic system.
  • Compactor press body review:
  • Guillotine and tubular sliding revision, application of new pads
  • Overhaul of the unloading door pads and check the wear of the guides
  • Removal of the tailgate
  • Disassembly of existing pads
  • Pads replacement
  • Revision of sliding guides
  • Repair of the compaction chamber from guillotine to door, where it will be necessary to extract the sheets of the roof and bottom sides, with supply and application of new wear-resistant sheets previously cut to size and welded on site
  • Sandblasting and painting of the press body by spray or roller (in this case the surface of the painting will be peeled), sandblasting and painting of the guillotine, door and legs
  • Front and rear stabilizers overhaul
  • Construction of the loading hopper with a capacity such as to provide a buffer necessary for the plant so as not to interrupt the production flow during the bale unloading phase.
  • Hopper arrangement with hydraulically operated door to load the material stored on the ground into the hopper