Compaction shovel overhaul, telescopic cylinder overhaul, hydraulic box overhaul, installation of a new electrical panel and also a new hydraulic system.
Compactor press body review:
Guillotine and tubular sliding revision, application of new pads
Overhaul of the unloading door pads and check the wear of the guides
Removal of the tailgate
Disassembly of existing pads
Pads replacement
Revision of sliding guides
Repair of the compaction chamber from guillotine to door, where it will be necessary to extract the sheets of the roof and bottom sides, with supply and application of new wear-resistant sheets previously cut to size and welded on site
Sandblasting and painting of the press body by spray or roller (in this case the surface of the painting will be peeled), sandblasting and painting of the guillotine, door and legs
Front and rear stabilizers overhaul
Construction of the loading hopper with a capacity such as to provide a buffer necessary for the plant so as not to interrupt the production flow during the bale unloading phase.
Hopper arrangement with hydraulically operated door to load the material stored on the ground into the hopper